LV | RU | EN
 

In 2009 BGS ltd has established a new division providing full scope of underwater works:

  • inspection;
  • welding;
  • cutting;
  • excavating;
  • reinforcement.

 

    

 

Works performed in 2009
1) Reconstruction of the pillar of Kalpaka bridge in Liepaja

    

 

2) Repair works of a membrane of the pier No. 3 in Ventspils port

    

 

3) Reconstruction of inverted siphon at Mīlgrāvis
    

 

 4) Reinforcement of underwater slope in Mērsrags harbour with Incomate materials

    

 

5) Installation of electrical cables of 110 kW in Zaķusala